🪠

Drainage (DWV)

4"/3"/2" runs

drainage DWV plumbing calculator Jamaica

Estimate drainage and vent (DWV) system costs, including drain lines, traps, vents, and installation labor for sinks, toilets, showers, and fixtures.

  1. 1Count fixtures and drains
  2. 2Specify drain sizes (4", 3", 2")
  3. 3Add trap, vent, and pitch requirements
  4. 4Calculate piping run lengths and labor

Frequently Asked Questions

What drain size do I need?

Toilet: 4" minimum; Tub/shower: 2"; Sink: 1.5"–2"; Vent: 1.5"–2". Code requirements vary; check local regulations.

What is a P-trap?

A P-trap holds water to create a seal preventing sewer gases from backing up. Required on every fixture in Jamaica code.

Do I need vent pipes?

Yes, vent pipes allow air into the system for proper drainage and to release sewer gases. Every fixture needs a vent.

Stage 6

Electrical & Plumbing

TOTAL

J$39,300.00

Run & vent

Slope: ¼" per ft minimum

Fixtures

Pipe prices per 20ft (J$)

Note — drainage slope of ¼" per linear foot must be verified on-site. Confirm septic tank capacity with a licensed plumber.

Output

4" main10 ft · 1 sticks
3" toilet branches16 ft · 1 sticks
2" wet branches + vent20 ft · 2 sticks
1½" sink branches16 ft · 1 sticks
Wye fittings5
P-traps3
Closet flanges2
Cleanouts1
Pipe costJ$17,100.00
Fittings costJ$9,700.00
Labour costJ$12,500.00
SubtotalJ$39,300.00
GCTJ$0.00