Excavation

Trench & earthworks

excavation calculator Jamaica

Estimate the cost of excavation, trenching, and earthmoving for foundations, drainage, and site prep. Get accurate quotes in Jamaican dollars.

  1. 1Input cubic yard volume to be excavated
  2. 2Select excavation type (trench, foundation, fill, cut/fill)
  3. 3Choose equipment (shovel, bobcat, loader)
  4. 4Add labor hours and equipment rental

Frequently Asked Questions

How do I calculate excavation volume?

Multiply length × width × depth (in feet), then divide by 27 to get cubic yards. For trenches, measure length and cross-section area.

What equipment is standard in Jamaica?

Most Jamaica sites use manual labor with hand tools, or small equipment like walk-behind compactors. Larger projects use Bobcats or excavators.

Is fill material (dirt) included?

This calculator is for labor and equipment only. Add fill material costs separately if needed.

TOTAL

J$0.00

Trench size

One trench width and depth for every section. With no depth there is nothing to dig, so the total stays at zero until one is entered.

Trench width
ft
in
Depth
ft
in
Length
ft
in
Width
ft
in
Direct perimeter (overrides L×W)
ft
in

Rate

Marl by machine is the base case — no difficulty loading applied.

Ground condition

Digging method

Excavator or backhoe on site

Machine hire

Loader bucket in front, digging arm behind — the general-purpose site machine

One-off charge to bring the machine on site and take it back off.

Leave blank if the machine isn't being charged to this job.

Output

Trench depthNot entered — nothing to dig