🪨

Concrete Mix

C20 / C25 / C30

concrete mix calculator Jamaica C20 C25

Estimate concrete costs for your project, whether ready-mix delivered or site-mixed batches. Choose strength grade (C20, C25, C30) and calculate material and labor costs.

  1. 1Enter cubic yards or cubic meters of concrete needed
  2. 2Select concrete strength grade
  3. 3Choose ready-mix or site-mix
  4. 4Calculate total cost including delivery (if applicable)

Frequently Asked Questions

What does C20/C25/C30 mean?

The number indicates compressive strength in megapascals (MPa) after 28 days. C20 = 20 MPa (weakest); C30 = 30 MPa (strongest).

Should I use ready-mix or site-mix?

Ready-mix is convenient and consistent but more expensive. Site-mix (on-site batching) is cheaper but requires more supervision.

What is the typical cost per cubic yard in Jamaica?

Ready-mix: ~JMD 4,000–6,000 per cubic yard; Site-mix: ~JMD 2,500–4,000 depending on materials and labor.

Stage 8

Exterior Work

TOTAL

J$0.00

Concrete Mix

General slabs, footings · C20 (1:2:4)

Output

Cement bags0
Sand0.00 cu yd
Aggregate0.00 cu yd
Water~0 gal
Labour costJ$0.00
SubtotalJ$0.00
GCTJ$0.00