Estimate the cost of structural concrete columns and beams, including formwork, steel reinforcement, concrete mix, and labour for Caribbean construction.

  1. 1Specify column/beam dimensions and quantity
  2. 2Choose concrete strength (C20, C25, C30)
  3. 3Add rebar size and spacing
  4. 4Input labour rate (JIC or negotiated)

Frequently Asked Questions

What is the typical concrete strength in Jamaica?

Residential and commercial projects typically use C20 (20 MPa). Higher-rise buildings use C25 or C30. Check local building codes.

Do I need to add formwork separately?

Yes, this calculator includes formwork cost but you should review rental or purchase options. Many Jamaica contractors reuse wooden or steel forms.

How much rebar do I need?

Typical columns use 4–8 bars (depending on size) plus ties. Use the Rebar Design calculator for precise area calculations.

TOTAL

J$0.00

Height
ft
in
Width
ft
in

Widths over 1 ft add 66% of this rate per extra foot

Length
ft
in
Width
ft
in

Widths over 1 ft add 66% of this rate per extra foot

Steel reinforcement

VERTICAL BARS

Bar size

STIRRUPS / LINKS

Link size

Spacing

Bent links charged by the dozen β€” counted as labour

Concrete

Mix grade

Columns and beams are cast width Γ— width (circular columns as a cylinder). Footing pads use the footing sizes below and their depth. The framing + pour rate stays labour; this is the material for the pour.

Formwork material estimate

Lumber stock length (ft)

Ribs across each ply panel to stop bulging β€” closer spacing uses more 1Γ—3

This is a material takeoff for formwork: plywood sheets, 1Γ—3 (frames each ply panel and ribs it against bulging) and 2Γ—4 (bracing only), plus extras (nails, form oil, tie wire). Quantities are estimates based on typical formwork spacing β€” adjust inputs if your practice differs.

Column footing rebar

Output

───── Formwork Materials ─────
Column 10 ply Β· 0 Γ— 2x4 bracing (12') Β· 0 Γ— 1x3 (12')
Beam 10 ply Β· 0 Γ— 2x4 bracing (12') Β· 0 Γ— 1x3 (12')
Formwork TOTALS
Plywood (4Γ—8 sheets)0 sheets
2Γ—4 lumber (bracing)0 pieces
1Γ—3 lumber (frame + ribs)0 pieces
SubtotalJ$0.00